Discussion:
Very slow loading of drawings in Visio 2003
(too old to reply)
Arnold
2005-03-05 08:58:28 UTC
Permalink
Hi,
I am having trouble with loading drawings in Visio 2003 on my laptop (Win
XP). They mostly take up two to five minutes to load for a <1Mb drawing.
I can have the drawing load quicker if I temporally shut down the McAfee
scanner, or if I do NOT use Windows offline folders. Especially the mappings
to the stencils, included in this drawing that are also on offline folders
seem to take a lot of time.


The problem is that I DO need the virus scanner, and I DO need offline
folders, to make sure my files are constantly in sync with my colleagues
that also use Visio 2003 on a laptop in the same projects.


I use a Dell Inspiron 5150 with P4/3GHz/768Mb on XP Pro.
I tried Visiclean and a lot of other tools, but they do not seem to improve
the loading.

Does anyone have a suggestion for speeding up the loading of those files?


Thanks,

Arnold
gte
2005-03-09 08:06:50 UTC
Permalink
If you are able to disable virus scanning on network drives, try that to see
if performance is implroved. It helped in my case.

Regards
Gert
Post by Arnold
Hi,
I am having trouble with loading drawings in Visio 2003 on my laptop (Win
XP). They mostly take up two to five minutes to load for a <1Mb drawing.
I can have the drawing load quicker if I temporally shut down the McAfee
scanner, or if I do NOT use Windows offline folders. Especially the mappings
to the stencils, included in this drawing that are also on offline folders
seem to take a lot of time.
The problem is that I DO need the virus scanner, and I DO need offline
folders, to make sure my files are constantly in sync with my colleagues
that also use Visio 2003 on a laptop in the same projects.
I use a Dell Inspiron 5150 with P4/3GHz/768Mb on XP Pro.
I tried Visiclean and a lot of other tools, but they do not seem to improve
the loading.
Does anyone have a suggestion for speeding up the loading of those files?
Thanks,
Arnold
Loading...